REDBOURNE UPPER SCHOOL - EDUCATION PROJECT

  • p1bci7j98cf8i183kh98l1a19pt4.png
  • PPP_8016.JPG
  • p1bc7qmiv62ss6ui749kmm6u8e.png

About This Project

Educational Gas & Plumbing
Principle Contractor: Parkway Construction
Systems Covered: Heating, Hot & Cold Services, Gas, Above Ground Drainage, Ventilation, Cooling, BMS Controls
We have completed 2 phases at this school. The first phase was a design and build project for a 10,000ft2 extension to the existing technology block.
Phase 2 was a design & build project for a new performing arts & assembly hall, complete with ancillary areas, student toilets, and common rooms. The multi-use assembly hall doubles as a theatre seating up to 450 people. Fully air conditioned, the hall features retractable seating allowing flexible use of the space.

Our works comprised of:

  • Additions to existing plant room
  • New heating and domestic services
  • Natural passive ventilation throughout the extension
  • Upgraded the BMS controls
  • Solar thermal Installation
     

Phase 2 was a design & build project for a new performing arts & assembly hall, complete with ancillary areas, student toilets, and common rooms. The multi-use assembly hall doubles as a theatre seating up to 450 people. Fully air conditioned, the hall features retractable seating allowing flexible use of the space.

 

  • Installation of a large air handling unit, warm air cooling and humidification system. The system had to operate quietly, to be suitable for use during theatre productions.
  • New toilets
  • New Boilers & Plant room
  • Comfort Cooling & LTHW Heating combined with AHU
  • Radiator System
  • Full BMS Controls
  • New Gas Services
  • Mechanical Extract Ventilation
  • Domestic Water Installation
  • Dry Riser Installation
  • Above Ground Drainage