Educational Gas & Plumbing
Principle Contractor: Parkway Construction
Systems Covered: Heating, Hot & Cold Services, Gas, Above Ground Drainage, Ventilation, Cooling, BMS Controls
We have completed 2 phases at this school. The first phase was a design and build project for a 10,000ft2 extension to the existing technology block.
Phase 2 was a design & build project for a new performing arts & assembly hall, complete with ancillary areas, student toilets, and common rooms. The multi-use assembly hall doubles as a theatre seating up to 450 people. Fully air conditioned, the hall features retractable seating allowing flexible use of the space.
Our works comprised of:
Phase 2 was a design & build project for a new performing arts & assembly hall, complete with ancillary areas, student toilets, and common rooms. The multi-use assembly hall doubles as a theatre seating up to 450 people. Fully air conditioned, the hall features retractable seating allowing flexible use of the space.